How we work
What happens on every plastering job, from the first visit to the day we hand the rooms back.

- 1
A proper look first
We tap the walls to find hollow and loose plaster, check ceilings from below and above where we can, and note any signs of damp. The quote is based on what we find.
- 2
Clear written quote
You get it in writing: what comes off, what goes on, how many rooms are affected, and roughly how long each will be out of use.
- 3
Protection
Floors are sheeted edge to edge, doorways screened with dust sheets or zip doors, and furniture moved out or covered before any hacking off or mixing starts.
- 4
The right background
Loose material is cut back, suction is controlled with water, PVA or a bonding primer as the wall needs, and beads are fixed straight and plumb.
- 5
The right plaster
Gypsum on modern backgrounds, lime on old solid walls, moisture-resistant board in wet rooms. We do not use one product for everything.
- 6
Finish
Finish coats are laid on and trowelled up until the surface is closed and smooth, with sharp corners and clean edges round sockets and frames.
- 7
Every day
Waste is bagged and taken away, rooms are swept and access is kept clear at the end of each day.
- 8
Drying advice
We tell you how long the plaster should take to dry, how to help it along, and when it is ready for a mist coat.
- 9
Final look
Before we leave, we check the work with you in good light and put right anything that is not as it should be.
Walls or ceilings need sorting?
We come out, look at the plaster with you and send a written quote. Free, and no obligation.